UC San Diego, Ridge Walk

UC San Diego, Ridge Walk

Electrical engineering for the design and construction of landscape improvements on a portion of the pathway located on approximately 7.5 acres of the UCSD campus, stretching from Revelle Plaza to North Point Drive. Scope included determining power sources and coordination of lighting controls, and establishing lighting power distribution for the team’s lighting consultant. Services included preparing project technical specifications for electrical systems, as well as Title 24 compliance calculations and documentation.

  • La Jolla, CA
  • 2022
  • Electrical
  • 7.5 Acres
  • $9.5 million
  • Spurlock Landscape Architects
  • UCSD

© 2023 Randall Lamb.All Rights Reserved.